How long it takes to build an app, and what moves the launch date
About 3.5 to 5 months, or 15–22 weeks from kickoff to the app stores, for a business app with customers on iPhone and Android and staff on a web portal. The one priced here is a party rental company’s, with nine features. Take any one of them out and the launch moves by a week at most. With none of them, the app still takes 10–14 weeks, so most of the calendar is there before you’ve asked for anything.
- 15–22 weeks
- A party rental app: nine features, the staff web portal among them
- 1 week
- The most any one of those features adds, taking each out in turn
- 10–14 weeks
- The same app with every feature taken out
Written by
WhatWillMyAppCost
We build the estimator this site runs on, and we design and build custom mobile and web software for a living. Every figure below is the estimator’s own output, except the published vendor prices, which are read off each company’s own page and dated.
You’ve got an app in mind and you want to know when people could be using it. You’ve probably got a list of what it should do, too, and it’s natural to assume every line on that list pushes the launch back.
You’ll see how long a business app takes and what’s in it, which of its features adds the most time, how long the same app takes with no features at all, and what else changes the date. One app, changed one thing at a time.
How long does it take to build an app?
15–22 weeks, counted from kickoff to the app stores, for the app below. It belongs to a company that rents out tents, tables and chairs for parties and weddings, and it runs on iPhone and Android from one codebase.
Customers sign in, browse what’s for rent, search by date, then book and pay by card.
They drop a pin on a map where the tent goes, send a photo of the yard, and message the office about the setup.
They get a notification the day before delivery.
Staff work from a web portal, where they see every order, plan the week’s deliveries and mark what’s out.
The low end, 15 weeks, is the version where nothing surprising turns up in the work. The high end, 22, allows for the ordinary amount that does. Yours won’t match it exactly, so price your own. It opens on the rental app above: edit the sentence about what customers do, then the one about the staff portal, and the weeks follow.
Which feature adds the most time to an app?
The staff web portal, by about a week at each end. Take it out of the rental app and the estimate drops to 14–21 weeks. Messaging is the only other feature that changes the weeks the estimator shows: without it, the app runs 15–21 weeks.
Each line below is one feature taken out, with the other eight left in. The price drops every time. The weeks mostly don’t.
The staff web portal: $10,500 less, a week off each end.
Messaging with the office: $6,500 less, a week off the top of the range.
Paying by card: $3,500 less, no change in weeks.
Sign-in: $2,500 less, no change in weeks.
Separate permissions for customers and staff: $2,500 less, no change in weeks.
The pin on the map: $1,500 less, no change in weeks.
The photo of the yard: $1,000 less, no change in weeks.
Search by date: $1,000 less, no change in weeks.
The reminder the day before: $1,000 less, no change in weeks.
The portal tops the list because it’s a second application, and a second piece of software adds more money than weeks. Even the portal and messaging together, $18,000 of the price, only take the app to 14–20 weeks. Take the seven smaller ones out together instead and it’s 14–20 weeks too.
How long does an app with no features take to build?
10–14 weeks on iPhone and Android, which is most of what the rental app takes. That’s the same app with all nine features gone. No sign-in, no card payments, no portal, and nothing a customer could use yet.
- The rental app, all nine features
- 15–22 weeks. Customers browse, book, pay and message the office, and staff run the week from their portal.
- The same app with none of them
- 10–14 weeks. It opens on both phones, gets through store review, and does nothing yet.
One at a time, no feature on the rental app is worth more than a week. All nine together are worth 5 weeks at the low end and 8 at the top.
Those first weeks go on what every app needs before it does anything: working out exactly what gets built, the look every screen shares, the way you get from one screen to the next, a server and somewhere to run it, and getting through store review. Kickoff, your review rounds and store review take 2 to 3 of them.
Features add less than you’d expect because the team grows with the job. The estimator works out the calendar from the total amount of work and puts more people on a bigger build, so a feature taken out mostly means a smaller team, and only a little less time. A $50,000 build shows the same thing from the budget side.
What else changes how long an app takes?
Work that already exists. If the app could run on a server you already have, one that works and is documented, it comes back at 14–21 weeks, the same week dropping the staff portal saves. Finished designs, with every screen drawn before the build starts, take it to 15–21 weeks.
How clearly it’s described sets how wide the range is: left vague, the same app comes back at 13–24 weeks around the same middle. A written brief is how you get the narrower one.
Your own pace counts too. The low end of every range on this page also assumes you answer questions quickly and look at each round of work when it’s ready.
An app with customers on iPhone and Android and staff on a web portal takes 15–22 weeks from kickoff to the app stores. With every feature taken out it still takes 10–14 weeks, and no single feature on it adds more than a week.
A working server takes off as much as the portal does, and a clear description keeps the range at 15–22 weeks where a vague one gets 13–24 weeks.
FAQ
Questions about how long an app takes
Can a single person develop an app?
One person can build an app, but the estimator doesn’t price that, so it can’t say how long it takes. Every figure it gives is for a team doing design, building, testing and project management, with more people on a bigger job.
How long does it take to build an app with AI?
If you mean building it with an AI app builder, the estimator doesn’t price those, so it has no figure for them. It prices a team building the app. AI features inside an app are something it does price, as one more line on the estimate, and adding AI to an app you already have goes through what that work involves.
How long does it take to build an iPhone app?
The same as one for iPhone and Android, when both come from one codebase. A party rental app with nine features takes 15–22 weeks either way. Two separate apps, one written for each phone, add a week at each end: 16–23 weeks. What an iOS app costs covers the money.
Can an app be built in a month?
Not by the estimator’s numbers. It doesn’t start any range under 8 weeks, and an iPhone app with no features at all, every screen already designed and a working server behind it, still comes back at 8–11 weeks. If something has to be in people’s hands in a month, look at products you can buy and set up.
Does offline mode add a lot of time to an app?
About a week at each end. Add working with no signal to a party rental app with nine features, with everything syncing back once the phone reconnects, and it goes from 15–22 weeks to 16–23 weeks. What offline mode costs has the money side.
What does an app development timeline include?
Everything from kickoff to the app stores: working out what gets built, design, building, testing and store review, with your own review rounds along the way. The estimator’s weeks stop there. Writing the brief before kickoff, and getting people using the app after launch, come on top, and it has no line for either.