You’re getting close to having an app built, and the contract has to say how the work gets billed. A fixed price sounds safer. Time and materials sounds open-ended. Both are fair ways to buy software, and they put the same uncertainty in different hands. Whose hands it should sit in depends on how much of your project anybody can describe today.

Below: what each contract is, what a fixed price has to cover, what time and materials comes to in money and weeks, which one fits your project, and how one build can use both. The contract definitions come from the Federal Acquisition Regulation, the rules federal agencies buy under, read on October 16, 2026.

What is the difference between fixed price and time and materials?

Who carries the risk that the work runs long. A fixed price is one number for an agreed scope, settled before the work starts, and the studio absorbs whatever the work costs past it. Time and materials bills for the time the work takes, plus anything bought for your project, and you pay what that comes to.

A fixed price, on the day you sign
You know the bill. Whether the work comes in under it or over it stops being your problem, because the studio gains or loses the difference. Anything added to the scope later gets priced on its own.
Time and materials, on the day you sign
You know the range and what the work covers. The bill is whatever the work takes, and you find out where it lands as the invoices come in. A change of direction goes on the bill like any other work.

What does a fixed price have to cover?

The work running long, because it’s agreed before anyone knows where in the range the work will land. The less that’s settled, the nearer the top it has to sit, which what a studio needs to quote you covers. In the estimator, the bottom of a range assumes a clean connection to every other system, quick answers from your side and no surprises. The top assumes the ordinary amount of trouble with each.

The app here is for a company that manages about forty apartment buildings. Tenants say what’s broken, take a photo of it and see when somebody’s coming. Staff assign the work from a web portal of their own. New requests have to go into a system a developer built for the office twelve years ago, and the existing records have to come across from it. Nobody has looked at that system yet, and the records haven’t been checked.

Those two are open questions, and the estimator prices them on the top of the range only. Every range gets 8% of its middle added to the top for the things nobody has listed. Each question somebody has named but nobody can answer yet adds another 3.5%, up to 15%. How the estimate is built has the method.

The same app, with both questions answered
$41,000 – $59,000. Somebody has been through the old system and the records, so neither one is a question anymore.
The same app, with both still open
$41,000 – $62,000. The bottom hasn’t moved. The top is $3,000 higher, which is what the estimator adds in case either one goes badly.

A fixed price signed today pays for both open questions up front, whether or not they go badly. Time and materials pays for whatever they turn out to take.

Most of the $21,000 between the ends is there with nothing open at all, because every piece of the work has a range of its own. Describe the same app loosely and the range spreads at both ends, which the guide to writing a brief prices. Under a fixed price the studio carries all of it, and the number pays for carrying it.

What does time and materials cost?

Whatever the work takes, billed as it’s done. On the repair app the estimator puts the work between $41,000 and $62,000, over 14–21 weeks, and on the first day there’s no telling where in that span it’ll finish.

The old system has a way in, the records are tidy, and the rest goes cleanly
The bill heads for the bottom, near $41,000 and 14 weeks. You don’t pay for a bad outcome that never came.
Both questions bring the usual trouble, and so does the rest
It heads for the top, near $62,000 and 21 weeks. A fixed price would’ve had to be ready for this from the start.

Either question can also turn out worse than ordinary. An old system with nowhere safe to test can take a month to connect to, and records with years of exceptions in them can be a job of their own. Then the bill can pass the top. Under time and materials that’s yours to pay, and under a fixed price it would’ve been the studio’s.

Which one fits your project?

The one that matches how settled the scope is. Among the cases the federal rules give for a fixed price is work where “performance uncertainties can be identified and reasonable estimates of their cost impact can be made, and the contractor is willing to accept a firm fixed price representing assumption of the risks involved” (FAR 16.202-2). The same rules allow time and materials only when “it is not possible at the time of placing the contract to estimate accurately the extent or duration of the work or to anticipate costs with any reasonable degree of confidence” (FAR 16.601).

  • A fixed price fits when you can say what finished looks like: every kind of user, what each one does, what the app connects to and what already exists, with nothing on that list marked “nobody knows.”

  • Time and materials fits when part of the job is finding out. An old system that’s never been opened up, records that haven’t been checked, or a first version you expect to change once people start using it.

For you, a fixed price buys a number you can take to whoever signs off on the budget. For the studio, it’s a promise it can keep when the scope is settled enough to price. When the scope isn’t, time and materials suits both sides, because nobody has to put a price on a guess.

Can you use fixed price and time and materials on one project?

Yes. One build can do both: a fixed price on the part that’s settled, and time for the part that isn’t. On the repair app, the tenant app and the staff portal on their own come to $38,000 – $53,000, with nothing left open. Add the connection to the old system and the records, and it’s $41,000 – $62,000.

Those two pieces lift the bottom of the range a little and the top by $9,000. That’s what open work looks like in an estimate, and it’s the part a fixed price would have to guess at.

The other route is to answer the open questions before anybody fixes a price. Once somebody has looked at the old system and the records, the whole build can go on one fixed price.

A fixed price is one number agreed before the work starts, so it has to hold if the work runs long, and the studio carries everything between the ends. Time and materials bills what the work takes, and that span stays with you. On the $41,000 – $62,000 repair app, the span is $21,000.

A settled scope suits a fixed price. Open questions suit time and materials, or a split with the settled part fixed and the open part billed by time.

FAQ

Questions about fixed price and time and materials

What is a firm-fixed-price contract?

A contract whose price stays put whatever the work ends up costing the contractor. The Federal Acquisition Regulation, the rules federal agencies buy under, defines it at section 16.202-1 as a price “not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract.” That puts “maximum risk and full responsibility for all costs and resulting profit or loss” on the contractor. The price can still change when the scope does.

What is a fixed-price contract in project management?

One price for a defined scope, agreed before the work starts. The scope document is what the price buys. On an app, that’s the screens, the kinds of user and the systems it talks to. Work outside it gets priced separately, as a change, and the price for everything inside it holds.

What is a T&M pricing model?

Billing for the time the work takes at agreed rates, plus the cost of anything bought for the project. The name is the two halves: time is the labor, materials is everything else. The federal rules describe the same thing at section 16.601, and they call it a labor-hour contract when the contractor supplies no materials, “differing only in that materials are not supplied by the contractor” (16.602).

Do T&M contracts have fees?

Not as a separate line in the federal definition. Under section 16.601 of the Federal Acquisition Regulation, the work is billed at rates fixed in the contract, with everything the contractor charges for its time inside them, and materials are billed at actual cost. On an app build, materials covers things bought for your project, like hosting or a paid service the app runs on, and the contract says how they get billed.

Is fixed price or time and materials cheaper?

Neither, on its own. On an app the estimator prices at $41,000 – $62,000, time and materials comes in under a fixed price when the work goes well, about level with it when the usual problems turn up, and over it when something goes worse than usual. A fixed price is settled up front and has to hold in all three cases, so the studio sets it for the work running long. Time and materials costs you wherever the work lands.

How do you budget for a time and materials project?

Against the top of the range, the same as any estimate, because a budget set at the middle has no room for the usual problems. On an app priced at $41,000 – $62,000 over 14–21 weeks, that means having $62,000 and 21 weeks available, and treating whatever’s left as yours to keep.

Should an MVP be fixed price or time and materials?

Fixed price if the first version is decided and nothing in it is an open question. Time and materials if finding out is part of the job. Keeping the first version small makes a fixed price easier to agree, because there’s less in it to guess at, and what an MVP should cost covers what to leave out.